B. adjustments, C. lubrication – American Dryer Non-Tilting Phase 5 ML-200 User Manual

Page 42

Advertising
background image

38

B. ADJUSTMENTS

7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER

Inspect bolts, nuts, screws (bearing set screws), non-permanent gas connections (unions, shut-off valves,

orifices, and grounding connections). Motor and drive belts should be examined. Cracked or seriously frayed

belts should be replaced. Tighten loose V-belts when necessary. Complete operational check of controls and

valves. Complete operational check of ALL safety devices (door switch, lint drawer switch, sail switch, burner

and hi-limit thermostats).

C. LUBRICATION

MONTHLY

The two (2) bearings that support the impellor/fan shaft must be lubricated. Use Shell Alvania #2 grease or its

equivalent. Generically, this grease would be described as an NLGI Grade 2 multipurpose industrial grease

with a lithium thickener and mineral base oil.

EVERY 3 MONTHS

The four (4) bearings that support the drive and idler shafts must be lubricated. Use Shell Alvania #2 grease

or its equivalent. Generically, this grease would be described as an NLGI Grade 2 multipurpose industrial

grease with a lithium thickener and mineral base oil.

Advertising