American Dryer Non-Tilting Phase 5 ML-200 User Manual

Page 55

Advertising
background image

51

SECTION IX

PROCEDURE FOR FUNCTIONAL CHECK OF

REPLACEMENT COMPONENTS

1. Microprocessor (computer) Board

a. Upon completing installation of the replacement microprocessor (computer) board, reestablish power to

the dryer.

b. Start the drying cycle.

c. Verify that the motor(s) and the heat indicator dots, in the microprocessor (computer) L.E.D. (light emitting

diode) display are on. (Refer to the illustration below.)

d. Verify that motor(s) heat, and door indicator lights on the back side of the microprocessor (computer)

board are lit. (Refer to illustration below.)

Advertising