Environmental monitoring, Input load, Sensors – American Power Conversion AmpMeter PDU User Manual

Page 12: Configuration, System, Environmental monitoring 12, Operations

Advertising
background image

3. Operations

Environmental Monitoring

The Environmental Monitoring section offers access to the Input Load page. This section is available to
administrative level users and users with Environmental Monitoring view rights.

Input Load

The Input Load page displays the AmpMeter PDU (s) absolute and descriptive name and the cumulative input
load in amperes of all devices attached to the AmpMeter PDU at the time the page was loaded. This page will
refresh automatically every 10 seconds.

Sensors

The Sensors page displays:

Temperature/humidity sensor’s absolute and descriptive names

Temperature/humidity sensor readings in degrees Celsius and percent relative humidity

Configuration

The Configuration section offers access to all unit configuration options including Network, Telnet/HTTP, Serial
Ports, Outlets, Groups, Users, FTP, Proxy/SNTP and SNMP. This section is available to administrative level
users only.

System

The System configuration page is used for reference of system information such as Ethernet NIC Serial Number,
Ethernet MAC address and system firmware and hardware revisions as well as assignment and maintenance of
the system location and tower descriptive names.

For description names, up to 24 alphanumeric and other typeable characters (ASCII 33 to 126 decimal –
spaces and colon characters are not allowed) are allowed.

NOTE: Spaces may be used for the location description only.

Creating a descriptive system location name:

Enter a descriptive name and press

Apply

.

Creating a descriptive unit name:

Click on the

Tower Names

link.

On the subsequent Tower Names page, enter a descriptive name and press

Apply

.

Creating descriptive input feed names:

Click on the

Input Feed Names

link.

On the subsequent Input Feed Names page, enter a descriptive name and press

Apply

.

Creating a descriptive Pass through port name:

Click on the

Serial Port Names

link which will open the Serial Ports configuration page. See Creating a

descriptive serial port name: on page 14 for additional information on creating descriptive Serial port names.

Creating a descriptive Environmental Monitor name:

Click on the

Environmental Monitor Names

link.

On the subsequent Environmental Monitor Names page, enter a descriptive name and press

Apply

.

Creating descriptive sensor names:

Click on the

Sensor Names

link.

On the subsequent

Sensor Names page, enter a descriptive name and press

Apply

.

Page 12 - 301-0399-3 Rev A.

Advertising