SECTION 4.2

OPERATIONAL ANALYSIS

DC CONTROL

PART 4

Page 85

XB1, Wire B, and a bridge rectifier. The standby
closing coil energizes and the main current carrying
contacts of the transfer switch are actuated to their
'Standby" source side.

• As the main contacts move to their "Standby"

source side, a mechanical interlock actuates limit
switch XB1 to its open position and limit switch XA1
to its "Utility" side position. When XB1 opens,
standby closing coil C2 3 de-energizes.

• "Standby" power is delivered to the "Load"

terminals (T1/T2) of the transfer switch.

F1

SM

C1-1

15

0

0

18

C1-5

56

18

17

15

17

15A

SCR

0

0

0

15

16

239

15

14

0

194

23

13

18

D

IM2

IM1

SP2

SP1

23

16

0

13

SC

0

SW1

15

15A

239

194

FS

0

14

C2-1

WINDING

(STATOR)

POWER

22

44

11

CB1

33

56VA

1VA

13

225

225A

224A

224

TX

17

N1

N2

11

22

C2-5

N2

N1

C2-6

11

194

23

194

23

N1

N2

CUSTOMER
SUPPLIED

BATTERY

12V

BLACK

RED

SC

240V

120V

120V

CUSTOMER

CONNECTIONS

COIL

12Vdc

UTILITY

INPUT

240VAC

RELAY

TRANSFER

TR

12VDC ACCESSORY SOCKET

+

-

14

0

0

15

17

22

N

11

23

194

22

D

GFCI

OUTLET

EXTERNAL

G

G

G

L

N

L

11

G

G

N

N

CB3

N

0

0

15

15

15

13

15

15B

15B

F2

0

0

239

Figure 5. Circuit Condition - Initial Transfer to

Standby

Advertising