JLG M4069 ANSI Service Manual User Manual

Page 48

Advertising
background image

SECTION 3 - CHASSIS & SCISSOR ARMS

3-20

– JLG Lift –

3121122

4. Cut and remove the Wire Ties holding the Harness

label to the harness. Next, remove the Wire Ties so
that the cable sleeve can be moved, exposing the
conductors of the harness.

5. Cut wire 106 going to the Engine/Generator Control-

ler after the existing connection point and install the
conductors that lead to the new in-line fuse holder.
Use insulated butt splice connectors for these con-
ductors.

6. Re-install the harness with the new fuse in place.

7. Reconnect the lift and APU start battery. The APU is

now ready for use.

Advertising
This manual is related to the following products: