Hub-spindle disassembly, Hub-spindle disassembly -36 – JLG M4069 ANSI Service Manual User Manual

Page 64

Advertising
background image

SECTION 3 - CHASSIS & SCISSOR ARMS

3-36

– JLG Lift –

3121122

Hub-Spindle Disassembly

1. Place unit on bench with Spindle (1) end down.

2. Remove Retaining Ring (2) with appropriate tool.

3. Remove Spacer (3).

4. Remove "A" position Bearing Cone (4) from Bearing

Cup (5) in Hub (6).

5. Lift Hub (6) off of Spindle (1). Remove Boot Seal (7)

from Hub if applicable.

6. If necessary, press 9 Studs (8) out of Hub. Locate

Hub on Seal (refer to Figure 3-17.) end.

7. Remove Seal from Hub.

NOTE: The Seal should NOT be reused when reassembling

the unit.

8. Remove "B" position Bearing Cone (9) from Hub.

9. Using a soft steel rod, knock both Bearing Cups (5)

out of the Hub.

1. Spindle

2. Retaining Ring

3. Spacer

4. Bearing Cone

5. Bearing Cup

6. Hub

7. Boot Seal

8. Studs

9. Bearing Cone

Figure 3-22. Hub-Spindle Disassembly

Advertising
This manual is related to the following products: