Chapter 10: powering up, Initializing the system, Chapter 10 – ElmoMC ExtrIQ Gold Line Servo Drives-Gold Eagle User Manual
Page 63: Powering up, Pow ering up
Advertising
Gold Eagle Installation Guide
MAN-G-EAGIG-EC (Ver. 1.000)
||Initializing the System
63
Chapter 10:
Pow ering Up
After the Gold Eagle is connected to its device, it is ready to be powered up.
Caution:
Before applying power, ensure that the DC supply is within the specified range
and that the proper plus-minus connections are in order.
10.1. Initializing the System
After the Gold Eagle has been connected and mounted, the system must be set up and initialized.
This is accomplished using the EASII, Elmo’s Windows-based software application. Install the
application and then perform setup and initialization according to the directions in the EASII User
Manual.
Advertising