Wear Plate Installation

1. Install the two cylinder

o-rings.

2. Using silicon sealant, coat the circumference of the

concrete cylinders, the back of the wear plate and

around the five bolt holes. Next, install the wear plate

and the five bolts. The bolts must all be equally snugged

and tightened to 100 foot pounds each.

Wear Ring Installation

1. Install the wear ring into the

nun plate.

2. Install the steel insert ring inside of the rubber energizer

ring.

3. Install the energizer ring assembly into the nun plate.
4. After installing the above mentioned components

the machine can be reassembled by reversing steps

1 through 5 of the Wear Plate and Cutting Ring

Replacement Procedure.

Heat Exchanger Cooling Fan

This section is intended to make sure the cooling fan is

working properly. Under normal conditions the fan should

be running any time the engine is turned on.

Pressure Test

1. To determine the pressure of the hydraulic system,

set the

cylinder stroke control switch (Figure 52) to

the

JOG position.

Figure 52. Cylinder Stroke

Control Switch (JOG)

NOTICE

If the hydraulic oil temperature exceeds 170° F (77° C),

shut down the pump.

DO NOT continue to operate the

pump. Failure to shut down the pump will result in severe

damage to the pump.

AUTOMATIC

JOG

CENTER

OFF

2. Place and hold the

manual cylinder jogging switch

(Figure 53) to either

JOG “A” or JOG “B” position to

test the pressure of that cylinder.

Figure 53. Manual Cylinder Jogging Switch

3. The

pumping pressure gauge (Figure 54) should

read approximately 3100 ~ 3200 PSI.

Figure 54. Pumping Pressure Gauge

JOG

“A”

JOG

“B”

CYLINDER STROKE

0

PUMPING

PRESSURE

1000

2000

3000

5000