Chapter 1, Installation/wiring – Rockwell Automation 20D DC SCR Precharge Module User Manual

Page 11

Advertising
background image

Chapter

1

Installation/Wiring

This chapter provides information on installing and wiring the DC SCR
Precharge Module.

Most start-up difficulties are the result of incorrect wiring. Every precaution
must be taken to assure that the wiring is done as instructed. All information
must be read and understood before the actual installation begins.

For information on ...

See page ...

Minimum Mounting Clearances

1-2

Ambient Operating Temperature

1-2

AC Supply Source Considerations

1-3

General Grounding Requirements

1-3

Fuses

1-4

Minimum Capacitance

1-4

Maximum Loading

1-4

Power Wiring

1-5

Control Wiring and Terminals

1-8

Control Wiring Requirements

1-9

Drive Run Interlock

1-9

Typical Power and Control Wiring Examples

1-10

!

ATTENTION: The following information is merely a guide for
proper installation. Rockwell Automation, Inc. cannot assume
responsibility for the compliance or the noncompliance to any
code, national, local or otherwise for the proper installation of this
module or associated equipment. A hazard of personal injury and/
or equipment damage exists if codes are ignored during
installation.

Advertising
This manual is related to the following products: