Precharge control relay cr led indicator, Precharge control relay cr led indicator -3 – Rockwell Automation 20D DC SCR Precharge Module User Manual

Page 25

Advertising
background image

Start-Up / Troubleshooting

2-3

Applying AC Power to the Drive with the DC SCR Precharge Module

10.Apply AC power and control voltage (115 VAC) to the DC SCR

Precharge Module. The green LED on the Precharge Control Relay CR
should be on if the drive control logic completes precharge and the SCR
control starts gating the SCR power module.

11.If the green LED on the Precharge Relay CR is not on at this point,

disconnect incoming power and refer to

Table 2.B

for troubleshooting.

Precharge Control Relay CR
LED Indicator

The DC SCR Precharge LED (

Figure 2.1

) on the Precharge Control Relay

CR is visible from the board’s side of the Module, depending on the
position of the Module. The Precharge Control Relay CR is mounted on the
terminal block TB1. When the LED is lit solid green, it indicates that the
DC SCR Precharge Module is gating properly and the precharge sequence
is complete.

Figure 2.1 Location of LED on the Precharge Control Relay CR and W* Jumpers

CR

TB1

W1

W3

J3

J3

J1

J1

J2

TB2

W2

AK

K

A

HK

AIR FLOW

A1

A2

CR

TB1A

G

T

NAMEPLATE

+DC IN

+DC OUT

DANGER

CAN CAUSE SHOCK
BURNS, OR DEATH

SURFACES

MAY BE HOT

LED

DANGER

REMOTE SOURCES

DANGER

REMOTE SOURCES

DANGER

RISK OF SHOCK

REPLACE AFTER

SERVICING

(W1) JMP1

TOP VIEW

LEFT SIDE VIEW

(W2) JMP2

(W3) JMP3

GND

!

ATTENTION: The DC SCR Precharge Module is only
operational when the unit is energized. Servicing energized
equipment can be hazardous. Severe injury or death can result
from electrical shock, burn, or unintended actuation of the
controlled equipment. Follow safety-related practices of NFPA
70E, ELECTRICAL SAFETY FOR EMPLOYEE
WORKPLACES. DO NOT work alone on energized equipment!

Advertising
This manual is related to the following products: