Minimum mounting clearances, Ambient operating temperature – Rockwell Automation 20D DC SCR Precharge Module User Manual

Page 12

Advertising
background image

1-2

Installation/Wiring

Minimum Mounting
Clearances

The air inlet and outlet areas for each DC SCR Precharge Module must be a
minimum of 200 square centimeters (31 square inches). The
Length-to-Width Ratio must not exceed 4:1.

Figure 1.1 Minimum Mounting Clearance for 500A and 750A DC SCR Precharge

Modules

Figure 1.2 Minimum Mounting Clearance for 1000A and 1600A DC SCR Precharge

Modules

Ambient Operating
Temperature

All DC SCR Precharge Modules are designed to operate at 0° to 50°C
(32° to 122°F) surrounding air ambient without derating.

Air Flow

Air Outlet

Air Flow

Air Inlet

120 mm

(4.7 in.)

120 mm

(4.7 in.)

GND

AK

K

HK

G

DATA NAMEPLATE

+DCin

+DCout

DANGER

DANGER

CAN CAUSE SHOCK
BURNS, OR DEATH

SURFACES

MAY BE HOT

REMOTE
SOURCE

Fan

Air Flow

Air Outlet

Air Flow

Air Inlet

Fan

120 mm

(4.7 in.)

120 mm

(4.7 in.)

GND

+DCin

HK

G

DANGER

DANGER

CAN CAUSE SHOCK
BURNS, OR DEATH

SURFACES

MAY BE HOT

REMOTE
SOURCE

+DCout

Advertising
This manual is related to the following products: