Metrohm 813 Compact Autosampler User Manual

Page 21

Advertising
background image

2

Installation

813 Compact Autosampler

15

7

31

8

32

11

13

32

31

17

15

6

6

Fig. 9 Installing the pump tubing

6

PEEK compression fitting

6.2744.010

15

Snap-action lever

7

PEEK capillary 6.1831.050

17

PEEK capillary 6.1831.060

or 6.1822.410

8

Pump tubing 6.1826.040

31

Coupling 6.2744.030

11

Tubing cartridge 6.2755.000

32

Stopper (black)

13

Contact pressure lever

2.3.8 Tubing connection to Metrohm 761 / 790 IC–Systems

3 Connection pump tubing – injection valve

• Use a 6.2744.010 PEEK compression fitting and a 6.2744.030

coupling to tighten the 6.1831.060 PEEK capillary

17

to the

pump tubing

8

.

• Loosen the screw thread of the outer connector of the suction

tubing inside the Ion chromatograph (see the Ion chromato-

graph's user manual).

• Replace the suction tubing of the Ion chromatograph with

PEEK capillary

17

. Pass it through the outer connector of the

front side of the housing.

• Use a 6.2744.010 PEEK compression fitting to tighten the

capillary to the connector "1" of the injection valve.

4 Tubing connection injection valve – waste

• Remove the coupling and the 6.2744.010 compression fitting

from syringe tubing.

• Lead the free end of the syringe tubing to the waste con-

tainer and fix in place.


Advertising