9 tubing connection to a metrohm 747 va stand, 10 tubing connection to a metrohm computrace 757 – Metrohm 813 Compact Autosampler User Manual

Page 22

Advertising
background image

2.3 Attaching the accessories

16

813 Compact Autosampler

2.3.9 Tubing connection to a Metrohm 747 VA Stand

3 Connection Pumpschlauch – VA Stand 747

• Use a 6.2744.010 PEEK compression fitting and a 6.2744.030

coupling to tighten the 6.1831.060 PEEK capillary

17

to the

pump tubing

8

.

To keep the dead volume as small as possible shorten the

pump tubing to a suitable length.

4 Measuring head of the 747 VA Standes

• Insert the other end of the PEEK capillary

17

into a threaded

opening of the Measuring head of the VA Stand and fix it

with a 4.420.2580 fitting screw.

Metrohm

747

Fig. 10 Connection of a 747 VA Stand

Fig. 11 Measuring head of the747 VA Stand

2.3.10

Tubing connection to a Metrohm Computrace 757

Install tubing connections 813 Compact Autosampler – 757 VA

Computrace as shown above for the 747 VA Stand. See the 757

VA Computrace user manual for more details.

sample

6.1822.410 PEEK capillary

rinsing

waste

elektrolyte

gassing /

vent

4-way-micro tip

Advertising