Metrohm NIRS XDS SmartProbe Analyzer User Manual

Page 28

Advertising
background image

26

▪▪▪▪▪▪▪

13.

Install the ferrite onto the RJ-45 cable as

shown. This is detailed in the sheet
attached to the ferrite.

This ferrite is required for CE Emissions
(EMI) compliance. All users in the
European Community are required to
install this ferrite.

14.

When all the above assembly is finished,

turn on the power switch on the
monochromator. It is located on the
lower surface, on the right-hand side as
shown.

The monochromator performs some
initialization tests, which take a moment.
Some noises will be heard as items find
their initial positions. This is normal.

15.

Prepare to establish communication from

Vision to the XDS instrument. This is
detailed in Section 6.0, Vision Software.

This completes assembly of the Smart Probe Analyzer.

Advertising