Metrohm 757 VA Computrace User Manual

Page 24

Advertising
background image

3 Installation

757 VA Computrace – Hardware

20

N

2

V

3

V

2

V

4

V

1

4

33

50

72

73

Fig. 7: Scheme showing the inert gas connections at the 757 VA Computrace Stand

4

Gas wash bottle (6.2405.030)

for inert gas supply (must be filled only halfway with dist. H

2

O or

supporting electrolyte, see also Fig. 3)

33

Slotted screw for controlling the inert gas flow for deaeration

(see also Fig. 3)

Note: The factory setting of ca. 20 L/h should not be changed

without good reason!

50

Slotted screw for controlling the tapping power in the DME

case (see also Fig. 4)

Note: The factory setting should not be changed without good

reason!

72 Connection for inert gas supply of the MME

for raising and lowering the sealing needle in the MME (see also

section 3.3.1 and Fig. 8)

73 Connection for inert gas supply of the MME

for pressurizing the mercury (see also section 3.3.1 and Fig. 8)

V

1

…V

4

Valves

Advertising