Figure 19, High pressure pump – connect inlet – Metrohm 872 Extension Module User Manual

Page 38

Advertising
background image

4.6 High pressure pump

■■■■■■■■■■■■■■■■■■■■■■

30

■■■■■■■■

872 Extension Module IC Module

5

Fastening screws
For fastening the pump head.

6

Inlet valve holder

7

Pump head input capillary
PEEK capillary at the input of the pump
head.

8

Pressure screw
For connecting a PEEK capillary to the cou-
pling (18-

9

).

9

Coupling
For the connection of the eluent path at the
input of the high pressure pump. Can be
ordered together with the pressure screw
(18-

8

) under the number 6.2744.230.

10 Deaerating capillary

For aspirating the eluent when deaerating
the high pressure pump (see Chapter 4.6.2,
page 31)
.

11 Purge valve

For deaerating the high pressure pump.
With rotary knob in the center and pressure
sensor.

12 Connection capillary

For connecting the inline filter (see Chapter
4.7, page 33)

13 Connection capillary

Connects the output of the pump head with
the purge valve.

Note

The eluent aspiration tubing is already installed in the newly delivered
instrument. The following installation instructions need not be carried
out at the time of initial installation.

Connecting inlet to the high pressure pump

5

1

2

3

4

Figure 19

High pressure pump – Connect inlet

1

Pressure screw
For connecting the coupling (19-

2

) to the

pump head input capillary (18-

7

).

Can be ordered together with the coupling
under the number 6.2744.230.

2

Coupling 6.2744.230
For connecting the eluent aspiration tubing
(19-

4

) to the input of the high pressure

pump.

Advertising