I . Installation Instructions

1.

INSPECT ShIPMENT carefully for any signs of

damage. All equipment is carefully manufactured,

inspected and packed. Our responsibility ceases upon

delivery of Boiler to the carrier in good condition. Any

claims for damage or shortage in shipment must be filed

immediately against the carrier by the consignee. No

claims for variances or shortages will be allowed by

Boiler Manufacturer unless presented within sixty (60)

days after receipt of equipment.

2.

BOILER INSTALLATION must conform to the

requirements of the authority having jurisdiction, or in

the absence of such requirements, to:

U.S.A. - National Fuel Gas Code, ANSI Z223.1.

When required by the authority having juris-

diction, the installation must conform to

ANSI/ASME No. CSD-1.

CANADA - "Installation Codes for Natural and LP Gas

Burning Appliances and Equipment, CAN/

CSA-B149.1.

3.

These Gas Boilers are DESIGN CERTIFIED FOR

INSTALLATION ON COMBUSTIBLE FLOORING.

DO NOT INSTALL ThESE BOILERS ON

CARPETING.

NOTICE

Do not drop boiler. Do not bump boiler jacket

against floor.

4.

LOCATE BOILER in front of or behind installation

position before removing Crate. Locate on a level floor

as close to chimney as possible. For basement

installations, provide a solid base such as concrete, if

floor is not level or if water may be encountered on

floor around Boiler.

The boiler shall be installed such that the gas ignition

system components are protected from water (dripping,

spraying, rain, etc.) during boiler operation and service

(circulator replacement, control replacement, etc.).

DANGER

Do not install boiler where gasoline or other

flammable vapors or liquids, or sources of

hydrocarbons (i.e. bleaches, cleaners, chemicals,

sprays, paint removers, fabric softeners, etc.) are

used or stored.

5.

REMOvE CRATE -

A. Remove all crate fasteners. Lift off outside

container.

B. Remove all screws and brackets securing boiler to

skid.

C. Save two of the wooden slats from the container

sleeve for use in Steps D & E.

D. Tilt the boiler to one side and slide a wooden slat

under the two raised feet.

E. Tilt the boiler to the other side and slide another

wooden slat under the two raised feet.

F. Slide the boiler forward or backward off the skid

using the two wooden slats as runners.

6.

Move boiler to permanent position.

7.

PROvIDE CLEARANCE and AIR for COMBUS-

TION and vENTILATION.

WARNING

Adequate combustion and ventilation air must be

provided to assure proper combustion.

A. CLEARANCES

1. ALL INSTALLATIONS - Practical service

clearances must be considered (see Figure 1). A

minimum of 24" (6.0cm) from the left side and

front jacket panels is recommended for servicing

but may be reduced to minimum shown in

Figure 2. Subject to boiler and system piping,

left side clearance may be reduced to 1" (2.5cm)

if right side clearance is increased to 9"

(22.9cm).

2. ALCOvE INSTALLATIONS - An alcove is

considered a closet as shown in Figure 2 less

front. height clearance may be reduced to 27"

(68.6cm).

3. UNCONFINED SPACE (see definition,

paragraph (B) below) - height clearance may be

reduced to 27" (68.6cm).

B. PROvIDE COMBUSTION AND vENTILATION

AIR in accordance with applicable provisions of

local building codes, or: U.S.A. - National Fuel

Gas Code, NFPA 54/ANSI Z223.1, Canada -

Natural and Propane Gas Installation Code, CAN/

CSA-B149.1.
1. CLOSET INSTALLATIONS (confined space) in

a building of other than unusually tight

construction (see definition below), provide

combustion and ventilation air as shown in

Figure 2.

2. Installations other than closet in paragraph (1) :

a. Determine volume of space (boiler room).

Rooms communicating directly with space

(through openings not furnished with doors)

are considered part of space.