Warning – Burnham Series 2B User Manual

Page 7

Advertising
background image



Figure 3: Recommended Water Piping for

Zone Valve Zoned Heating Systems

Figure : Recommended Piping

for Combination Heating & Cooling

(Refrigeration) Systems

WARNING

Safety relief valve discharge piping must be

piped near floor to eliminate potential of severe

burns. Do not pipe in any area where freezing

could occur. Do not install any shut-off valves.

D. Install circulator with flanges, gaskets and bolts

provided. Five foot long circulator harness allows

circulator to be mounted on supply or return.

Connect harness to circulator and secure any excess

conduit.

E. For heating only system piping, see Figure 3.

Consult also I=B=R Installation Guides.

F. For space heating and domestic water heating with

Alliance SL™ water heater (intermittent circulation

only); install Alliance SL™ water heater as a

separate heating zone. Refer to Alliance SL™

Installation, Operating and Service Instructions for

additional information.

G. If this boiler is used in connection with refrigeration

systems, the boiler must be installed so that the

chilled medium is piped in parallel with the heating

boiler using appropriate valves to prevent the chilled

medium from entering the boiler, see Figure 4. Also

consult I=B=R Installation and Piping Guides.

If this Boiler is connected to heating coils located in

air handling units where they may be exposed to

refrigerated air, the boiler piping must be equipped

with flow control valves to prevent gravity

circulation of boiler water during the

operation of the cooling system.

h. Use a boiler bypass if the boiler is to be

operated in a system which has a large

volume or excessive radiation where low

boiler water temperatures may be

encountered (i.e. converted gravity

circulation system, etc.).

Install a pipe tee at the boiler return along

with a second tee in the supply piping as shown in

Figure 3. The bypass should be the same size as the

supply and return lines with valves located in the

bypass and supply outlet as illustrated in Figure 3 in

order to regulate water flow to maintain higher

boiler water temperatures.

Set the by-pass and boiler supply valves to a half

throttle position to start. Operate boiler until the

system water temperature is at a normal operating

range.

Adjust the valves to provide 180° to 200°F supply

water temperature. Opening the boiler supply valve

will raise the system temperature, while opening the

by-pass valve will lower the system supply

temperature.

I. A hot water boiler installed above radiation level

must be provided with a low water cutoff device as

part of the installation.

If a low water cut-off is required, it must be

mounted in the system piping above the boiler.

The minimum safe water level of a hot water boiler

is just above the highest water containing cavity of

the boiler; that is, a hot water boiler must be full of

water to operate safely.

Refer to Section vI for low water cut-off piping and

wiring instructions.

J. If it is required to perform a long term pressure test

of the hydronic system, the boiler should first be

isolated to avoid a pressure loss due to the escape of

air trapped in the boiler.

Advertising