Field Set-Up Checklist

Use the following tables to develop a final checklist for
your tractor/planter configuration. Additional or fewer
steps may be necessary depending on tractor features,
planter options and planting accessories.

To complete checklists, you may need to refer to the:
SRM: Seed Rate Manual (SRM),
PDC: DICKEY-john

®

Planter/Drill Control manuals, or

QSG: DICKEY-john

®

Quick Start Guide

Electrical Checklist

Page

Verify electrical hookups solid

16

Power-up seed monitor terminal and
observe any diagnostic messages

PDC

Verify Material and Rate, and hydraulic
drive and “SPLIT AIR” Channel setup

QSG

PDC

With hydraulic circuits in neutral, check
switches and indicator lights on CFM
switch panel. Confirm Master OFF.

-

Verify, with planter lowered, radar
speed sensor is pointed at ground,
approximately 35

° below horizontal.

a

a. Refer to sensor documentation.

Hydraulic Hitching Checklist

Page

Marker/Aux valve to Marker

36

Local bypass off (hydraulic hitch only)

17

Fan case drain to low pressure drain port

15

Fan return line to low pressure return port

15

All other hydraulic circuits connected

15

Check fan direction

a

and rpm

a. Operate fan briefly and observe rotor blades

spinning toward exit port. Check rpm on seed
monitor.

43

Check hydraulic drive connection

b

b. Perform a “FILL DISK” operation via the seed

monitor.

14

Mechanical Checklist

Page

Tongue height preset on 3-point

20

Unfold planter

24

Tongue front latch hook engaged

25

Side-to-side level at gauge wheels

21

Marker initial length set

54

Marker disc angle set

54

Air System Checklist

Page

Manifold to seed box or hopper seal

-

Add seed lubricant to each air box, prior
to first use, and prior to loading seed

122

Seed loaded

45

No air leaks (except from seed box)

-

Hose routings - no sags, no pinches
(check wing-folded & field positions)

-

Hoses fully connected to meters and
locked

Y-tubes turned on to correct rows

44

Blank disks at unused rows.

80

Shutters set the same on all rows.

76

Start fan. Turn on seed monitor active
air control. Watch for split air vane
movement or air pressure changes.

43

PDC

Activate the “FILL METER” function of
the monitor. Watch for air vane
movement, or watch meter
pressurization go to zero.

PDC

On a new planter, pre-lubricate the air
system with Ezee Glide Plus.

33

Set the meter pressurization target to
the recommended value for the crop.

PDC

Row Cleaner Checklist

Page

Check for correct installation of row
cleaners on all rows if equipped.

Check that row cleaners do not catch on
hydraulic hoses.

Carefully watch when folding and unfolding
planter the first time to ensure clearance of
row cleaners.

Frame Mounted Options Checklist

Page

Row cleaner depth setting

70

Coulter depth and alignment

71