Air-pro® meter disk installation, Air-pro, See “ air-pro – Great Plains YP2425A Operator Manual User Manual

Page 82: Meter disk installation ” on

Advertising
background image

78

YP2425A

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-626M

Table of Contents

Index

2014-02-10

Air-Pro

®

Meter Disk Installation

1.

Cross-check Seed Rate Chart data against part
number/description molded into disks to be used.

Population Risk:
Use the same disk in all active rows.

2.

Inspect disks to be installed. Do not install damaged
or excessively worn disks. Either can cause irregular
seeding. Chips and cracks accelerate brush wear.

3.

Remove meter rain cover (page 76).

Refer to Figure 107 (depicting an empty meter)
4.

Inspect meter (see page 101 for details).

5.

Make sure clamp

is aligned with seat

.

Refer to Figure 108
6.

With the seed pocket side facing the meter housing,
place the new seed disk on the disk seat.

7.

Rotate disk clamp

clockwise 45

° to clamp disk.

Clamp seats into detents

in disk hub.

Note: On a new meter, or with new brushes installed,

force the disk into the brushes to allow the disk
clamp to rotate. This condition eases as the brush
fibers are trained during initial rotations.

Note: With slightly used brushes, when a disk is first

clamped, it is normal for the disk hub to be flat with
the face of the disk seat only on the inlet (rear) side.
The disk fully seats as it first turns. This condition
eases as the brush fibers receive further use.

Brush Mis-Seating Risk:
Rotate disks forward shortly after disk installation. If planting
is not anticipated within an hour or two of disk installation,
rotate the drive system a few turns to ensure that meter brushes
lean in the correct direction. Correct lean improves meter
performance and reduces air consumption. This step is
particularly important for new brushes.

Brush seating may be accomplished with or without seed
present, and may be combined with “FILL DISK”. An
alternate method, which avoids running the tractor,
monitor and fan, is to rotate the section’s meter drive
shaft, top forward, with a

7

8

inch open-end wrench.

8.

Reset seed inlet shutter

to setting recommended

by Seed Rate Chart, or to your own developed value.

9.

On the monitor console, select the new Material,
seed disk Cell Count, and target population.

10. Re-install rain cover (page 76).

Figure 107

Disk Removed From Meter

29608

2

1

1

2

Figure 108

Disk on Clamp and Seat

29611

3

1

4

1

3

Figure 109

Disk Clamped

29614

4

Advertising