Reparing for, Nstallation – Conair CTS 7 User Manual

Page 21

Advertising
background image

You need these tools for installation:

❒ wire strain relief
❒ 16- or 18-inch adjustable wrench
❒ set of Allen wrenches
❒ ½ inch open or box end wrench
❒ flashlight

Plan the location.

Make sure the area where the saw

is installed has the following:

A grounded power source. Check the saw’s serial-

al tag for the correct amps, voltage, phase and
cycles. All wiring should be completed by qualified
personnel and should comply with your region’s
electrical codes.

Clearance for safe operation and maintenance.

Make sure there is enough clearance around the saw
for maintenance and servicing.

P

REPARING FOR

I

NSTALLATION

UGE058/0803

CTS Saw

I

NSTALLATION

3-3

1

2

WARNING: Improper installation, oper-
ation, or servicing may result in
equipment damage or personal injury.

This equipment should only be installed, adjust-
ed, and serviced by qualified technical person-
nel who are familiar with the construction, oper-
ation, and potential hazards of this type of
machine.

All wiring, disconnects, and fuses should be
installed by qualified electrical technicians in
accordance with electrical codes in your region.
Always maintain a safe ground. Do not operate
the equipment at power levels other than what
is specified on the machine serial tag and data
plate.

Advertising
This manual is related to the following products: