Hydronic piping – Crestron electronic Crest Condensing Boiler 3.5 User Manual

Page 26

Advertising
background image

Installation & Operation Manual

5

Hydronic piping

Near boiler piping components

1. Boiler

piping:

Boiler system piping should be sized per the pipe

requirements listed in Tables 5A and 5C.

2. Boiler circulating pump:

Field supplied. When using Primary/Secondary piping the

boiler circulating pump should be sized per Table 5A.

3. Hot Water Generator circulating pump:

Field supplied. When installed in a Primary/Secondary

arrangement, the Crest requires an additional pump for

the Hot Water Generator Loop. The pump should

be sized per Table 5A. Consult the indirect water

heater operating guide to determine flow characteristics

for the selected product used. The pump’s total flow and

heat requirements are the sum of the boiler and the indirect

water

heater.

4. Boiler

isolation

valves:

Field supplied. Full port valves are required. Failure

to use full port valves could result in a restricted flow

rate through the boiler.

5. Check

valves:

Field supplied. Check valves are required for

installation as shown in FIG.’s 5-2 and 5-3. Failure to

install check valves could result in a reverse flow

condition during pump(s) off cycle.

6. Domestic indirect hot water isolation valves:

Field supplied. Full port valves are required. Failure to use

full port valves could result in a restricted flow rate through

the

boiler.

7. Anti-scald mixing valve:
Field supplied. An anti-scald mixing valve is

recommended when storing domestic hot water above

115°F

(46°C).

8. Pressure

relief

valve:

Factory supplied. The pressure relief valve is sized to

ASME

specifications.

9. System temperature sensor:
Lochinvar supplies a system temperature sensor.

The sensor is to be installed in the heating loop

downstream from the boiler hot water piping and

heating loop junction. The sensor should be

located far enough downstream to sense system diluted

water

temperature.

NOTICE

A system supply sensor (factory supplied)
MUST BE installed with Primary/Secondary
systems for proper boiler operation.

10. Y-Strainer:

Field supplied. A Y-strainer or equivalent multipurpose

strainer is recommended at the inlet of the heat

exchanger to remove system particles from older

hydronic systems and protect newer systems.

26

ƽ CAUTION

The maximum allowable water flow rate
through a single Crest boiler is 350 GPM.
Exceeding this flow rate will result in damage
to the heat exchanger and/or piping.

NOTICE

Reference Table 5B1 for the minimum
recommended flow rate through a single
Crest boiler at full fire to maintain a 80°F
temperature rise. Reference Table 5B2 for
the absolute minimum flow rate through a
single Crest boiler.

TEMPERATURE RISE APPLICATIONS

MODEL

FLOW RATE (GPM)

FB(N,L)1500

35

FB(N,L)2000

46

FB(N,L)2500

58

FB(N,L)3000

70

FB(N,L)3500

81

[Based on 80°F Temperature Rise]

Table 5B1 Minimum Flow Rate with the Boiler at Full Fire

ABSOLUTE MINIMUM FLOW RATE

MODEL

FLOW RATE (GPM)

FB(N,L)1500

25

FB(N,L)2000

25

FB(N,L)2500

25

FB(N,L)3000

25

FB(N,L)3500

45

Table 5B2 Absolute Minimum Flow Rate

Advertising