30

Installation & Operation Manual

5

Hydronic piping

Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.

NOTICE

Y-STRAINER

(RECOMMENDED)

(TYPICAL)

RELIEF

VALVE

(TYPICAL)

BALL VALVE

(TYPICAL)

AIR SEPERATOR

DRAIN PORT
(TYPICAL)

SYSTEM
CIRCULATOR

BACK FLOW
PREVENTER

PRESSURE
REDUCING VALVE

PRESSURE

GAUGE

EXPANSION

TANK

FROM SYSTEM

TO SYSTEM

MAKE UP
WATER

BOILER DRAIN

(TYPICAL)

SYSTEM RETURN

SENSOR

SYSTEM SUPPLY
SENSOR

Figure 5-5 Multiple Boilers - Alternate - Common Header - Fixed or Variable Flow Primary

When installing multiple Crest boilers in fixed or variable flow primary applications, utilize a reverse-return