Dynojet 250: Torque Module User Manual

Page 12

Advertising
background image

Torque Module Installation and User Guide for Model 250 Dynamometers

C H A P T E R 1
Load Cell Installation

1-8

3

Install the load cell.
3a

Orient the load cell so the cable faces the dynamometer and the printing on
the load cell is right side up.

3b

Secure the load cell to the mounting bracket and the bracket welded to the
frame using two 1/2-13 x 2-inch bolts, four 7/16-inch flat washers, and
two 1/2-13-inch nylock nuts.

Figure 1-8: Install the Load Cell

Note: Older versions of the eddy current brake frame will require you to install
the sleeve into the load cell. You must also use a 3/8-16 x 2-inch bolt and
3/8-16-inch nylock nut for the lower hole.

Figure 1-9: Install the Load Cell on Older Brake Models

load cell cable

load cell

bracket welded

to frame

mounting bracket

sleeve

3/8-inch bolt

Advertising