Dynojet 250: Torque Module User Manual
Page 13
Advertising
TO R Q U E M O D U L E I N S T A L L A T I O N
Load Cell Installation
Version 4
Torque Module Installation and User Guide for Model 250 Dynamometers
1-9
4
Route the load cell cable.
4a
Make sure the load cell cable is clear of any power cables or hot or rotating
objects.
4b
Secure the load cell cable to the three existing bolts underneath the
aluminum top using three 5/8-inch cable clamps and 1/4-inch lock nuts.
Figure 1-10: Secure the Load Cell Cable to the Dyno
4c
Remove the bolt on the brake and place a 3/8-inch cable clamp on the bolt.
4d
Run the load cell cable through the clamp and tighten the bolt.
Figure 1-11: Secure the Load Cell Cable to the Brake
secure under aluminum top
load cell cable
load cell
cable
cable clamp
load cell cable
Advertising