Door frame assembly, A - door frame assembly, Please see page 16 for this end prep – EFCO 406 (T) Series User Manual

Page 19: Fig. # 15

Advertising
background image

A - DOOR FRAME ASSEMBLY

K996 SIM.

See #Y014 for International C.O.C. Installation Instructions.

See #Y013 for Dorma C.O.C. Installation Instructions.

If the jambs are not factory prepped, please

HEAD SHEAR

K978 PKG.

see page 18 for transom jamb glazing pocket cut out.

glazing stop tracks on the top of the transom bar.

Be sure the snap-in glazing pocket has been notched to clear the

Attach the transom bar to the jamb with the #K978 shear block

SECTION IV ASSEMBLY & INSTALLATION

or the K996 and the 'F' clip or angle bracket (#FT16) for a C.O.C.

NOTE: If an entrance frame is required, it must be installed first.

THIS ASSEMBLY IS

Factory prep shown.

SEE PAGE 23

AT A SINGLE DOOR.

OPPOSITE A C.O.C.

Please see page 16 for this end prep.

8402 DOOR JAMB

BLOCK PREP

Fig. # 15

Apply sealant to the

end of the transom bar
before attaching it to

TRANSOM BAR

the shear block.

8400

PAGE 17

DPS 12/2002

406 STOREFRONT

Advertising