Fig. # 25, Fig. # 23, Fig. # 24 – EFCO 406 (T) Series User Manual

Page 26: Fig. # 22

Advertising
background image

#8400

perimeter filler if structural loads require a greater shear strength at the anchor locations.

NOTE: These are general anchor locations. It may be necessary to use 9358 as the

All projects should be reviewed by a structural engineer for exact anchoring requirements

15" on center, typical spacing.

located 6" from the ends and

the jambs and tied into mullion sealant

16" on center, maximum spacing.

Continuous bead of sealant at

screws located 6" from the ends and

Anchor through the transom bar at

the back of the threshold and sides of

the door stop centerline with flat head

Fig. # 25

16" on center, maximum spacing.

Anchor through the S.S. jamb at

the door stop centerline with flat head

screws located 6" from the ends and

EXTERIOR

Attach through the threshold

at the condition.

with flat head screws

Fig. # 23

INTERIOR

Fig. # 24

SECTION IV ASSEMBLY & INSTALLATION

B - DOOR FRAME INSTALLATION

#9359

maximum spacing.

6" from the ends and 16" on center,

glazing pocket with flat head screws located

Anchor through the transom head/frame head

LB78/FV16

glazing pockets or distorting the door jamb.

anchors. This is to prevent collapsing the

locate them at the frame and door frame

backer (LB78) or use 3" pieces (FV16) and

recommends using full lengths of caulk

At the open back head and jamb, EFCO

LB78/FV1

6

Fig. # 22

#8402 SHO

W

N

(CONT.)

406 STOREFRONT

CSJ 11/2007

PAGE 24

9359 frame jamb & 9357 frame sill require
LB78/FV16 similar.

Advertising