General notes, Iii fabrication, A) screw spline fabrication – EFCO 406 (T) Series User Manual

Page 3

Advertising
background image

REFERENCE THESE OTHER MANUALS:

INTERNATIONAL 200 CONCEALED OVERHEAD CLOSERS

STOREFRONT INSTALLATION INSTRUCTIONS

DORMA RTS 88 CONCEALED OVERHEAD CLOSERS

SECTION I - GENERAL NOTES

2" x 6 1/2" - 1" GLAZING (THERMAL)

SERIES 406

to become thoroughly familiar with the project. The shop drawings

Check shop drawings, installation instructions, and glazing instructions

the standard 403 - 2" x 4 1/2" can be used with this deep system.

Clean aluminum surfaces with a mild detergent and water. No

and acid based materials can be harmful to the finish.

Protect materials after erection. Cement, plaster, alkaline solutions,

All materials are to be installed plumb, level, and true.

manufacturer for recommendations regarding compatibility and adhesion.

Sealants must be compatible with all surfaces. Consult with the sealant

Check construction for compliance with the contract documents.

as established by the architectural drawings and the general contractor.

All work should start from bench marks and/or column center lines

See Section II "PARTS IDENTIFICATION", also particular parts from

everything required to begin installation.

Check all of the materials upon arrival and be sure you have

AND COVER THE MOST COMMON CONDITIONS AND SITUATIONS.

THESE INSTALLATION INSTRUCTIONS ARE OF A GENERAL NATURE

take precedence for extrusions and details on the project.

Masonry runoff may leach harmful acids onto the storefront.
This situation must also be taken into consideration at installation.

REFERENCE THE STANDARD STOREFRONT INSTALLATION INSTRUCTIONS
FOR COVERAGE OF ITEMS COMMON TO STOREFRONT SYSTEMS.

DOOR, DOOR GLASS, and HARDWARE

SYSTEMS 401, 402, and 403

abrasive agent shall be used.

5)

6)

7)

3)

4)

2)

NOTE:

1)

Y014
Y015

Y001
Y013

PAGE 1

DPS 12/2002

406 STOREFRONT

Advertising