SECTION IV ASSEMBLY & INSTALLATION

A - DOOR FRAME ASSEMBLY

The glazing pocket will flush with the top of the transom bar or with

The transom jamb glazing pocket will snap into the cut out cavity.

NOTE: If an entrance frame is required, it must be installed first.

HEAD SHEAR

BLOCK PREP

8403 TRANSOM JAMB

GLAZING POCKET

See page 16 for end prep.

FOR THIS PREP

the top of the horizontal intermediate, if used.

The cut out must not
exceed 48" in length.
See page 20 for lengths
greater than 48".

SEE PAGE 23

8402 DOOR JAMB

3.313

TOP OF

TRANSOM BAR

1.188

(CONT.)

Fig. # 16