SECTION IV ASSEMBLY & INSTALLATION
A - DOOR FRAME ASSEMBLY
The glazing pocket will flush with the top of the transom bar or with
The transom jamb glazing pocket will snap into the cut out cavity.
NOTE: If an entrance frame is required, it must be installed first.
HEAD SHEAR
BLOCK PREP
8403 TRANSOM JAMB
GLAZING POCKET
See page 16 for end prep.
FOR THIS PREP
the top of the horizontal intermediate, if used.
The cut out must not
exceed 48" in length.
See page 20 for lengths
greater than 48".
SEE PAGE 23
8402 DOOR JAMB
3.313
TOP OF
TRANSOM BAR
1.188
(CONT.)
Fig. # 16
PAGE 18
DPS 12/2002
406 STOREFRONT