A - SCREW SPLINE FABRICATION

These units are then erected by mating the male mullion with the

permits the preassembly of single units in the shop or at the job site.

The screw spline system is a fabrication and erection method that

than other verticals. The glazing adaptor will be cut to the

NOTE: The screw spline door jamb runs to the floor and is cut longer

If the opening has an entrance, see the appropriate frame and

NOTE: Allow extra clearances, if necessary, to accommodate building

MEASURE THE OPENING TO DETERMINE THE CUT LENGTH

CUT THE HORIZONTAL GLASS STOPS TO DAYLITE OPENINGS

CUT THE HORIZONTAL MEMBERS TO DAY LITE OPENINGS.

DUE TO THE SCREW TENSIONS REQUIRED FOR CORRECT

ASSEMBLY SCREWS TO PREVENT GALLING AND BREAKAGE.

INSTALLATION, IT IS NECESSARY TO 'WAX' THE FRAME

NOTE: Allow minimum 1/

2

" shim and caulk space around the perimeter.

When an entrance is required, screw spline joinery may be used with

standard jamb and vertical intermediate length.

NOTE: Consult A.D.A. requirements to verify compliance.

door fabrication installation sheets.

tolerances and building movement.

MINUS 1/32". (D.L.O. - 1/32")

(BETWEEN VERTICAL MULLIONS)

NOTE: Drill jigs are available.

VERTICAL MEMBERS. (See Fig. # 1 page 5).

DRILL THE HOLES FOR ASSEMBLY SCREWS ON

NOTE: Verticals must run through.

CUT THE VERTICALS TO FRAME SIZE.

OF THE FRAME COMPONENTS.

the screw spline door jambs only.

See page 3 of the parts identification section.

STEP 4)

STEP 3)

NOTE)

STEP 1)

STEP 2)

female mullion counterpart.

SECTION III FABRICATION

PAGE 4

MDM 04

/200

8

406 STOREFRONT

Advertising