Template for o.g. shear blocks, Dj18 drill guide at transom head, B - shear blocks at screw – EFCO 406 (T) Series User Manual

Page 9: Step 5), Step 4), Step 1) step 2) step 3)

Advertising
background image

AT THIS TIME FOR EASE OF ASSEMBLY.

BLOCK PREPS, AS SHOWN ON PAGES 14 AND 15.

PROCEED TO SECTION III C FOR HORIZONTAL TO SHEAR

THESE PREPS SHOULD BE DONE TO THE DOOR JAMBS

HINGING PREPS, STRIKE PREPS, AND THRESHOLD PREPS.

HARDWARE MANUAL (PART #Y015), FOR THE DOOR

PLEASE REFER TO DOOR, DOOR GLASS, AND

(See page 3 of the parts identification section.

STEP 5)

NOTE: Drill jigs are available.

STEP 4)

B - SHEAR BLOCKS AT SCREW

head, and any intermediate horizontal that is being incorporated in

it will be necessary to shear block the transom bar, the transom

Because the screw spline door jamb is actually a tubular member,

Transom bar glass stop cut length = D.L.O. - 25/32"

Horizontal glass stop cut length = D.L.O. - 1/32".

Horizontals and transom bar cut length = D.L.O.

SECTION III FABRICATION

SPLINE DOOR JAMB

MEMBER'S SIGHT LINES TO DETERMINE THE HORIZONTAL

CUT THE DOOR JAMBS TO ROUGH OPENING MINUS 1/4".

DRILL THE HOLES FOR THE SHEAR BLOCK SCREWS ON

NOTE: Door jambs run to the floor and are cut longer than other

NOTE: Consult A.D.A. requirements to verify door opening

MEASURE THE OPENINGS AND SUBTRACT THE VERTICAL

THE DOOR JAMBS AS SHOWN ON PAGES 8 THROUGH 13.

FRAME CUT LENGTHS.

width compliance.

STEP 1)

STEP 2)

STEP 3)

verticals.

the transom area.

PAGE 7

CSJ 12/2006

406 STOREFRONT

Advertising