Important, Peak control – Steffes 2106 Owner & Installers Manual User Manual

Page 13

Advertising
background image

corD-connecteD (Plug-in) room heAting unitS

All cord-connected heaters are factory-

configured to be plugged into a 120V wall

outlet. The circuit outlet the heater is plugged

into should be designated solely to the

heater for circuit sizing purposes as well as

peak control and metering purposes in some

instances. To determine the correct circuit

size, refer to the Field Connection Wire and

Circuit Breaker Sizing Guide in this manual.

120V cord-connected room heating units

must only be used with receptacles that are

of the grounding type and suitable for the

load of the heater. (See Figure 6 for cord and

receptacle requirements.)

The room heater's cord has a plug as shown in Figure 6A. An adapter, as shown in Figure 6B, is available for

connecting three-blade grounding type plugs to two-slot receptacles. The green grounding means extending from

the adaptor must be connected to a permanent ground, such as a properly grounded outlet box as shown in Figure

6C. This adaptor should not be used if a three-slot grounded receptacle is available.

PeAK COnTrOl

Steffes ETS heating equipment is generally controlled by the Power

Company via a peak control signal. This signal can be sent to the heater

using the Steffes Power Line Carrier system, low voltage wiring, a Steffes

Time Clock Module, or line voltage wiring. In applications utilizing

automatic charge control, outdoor temperature information is required and

can be received via an outdoor sensor or power line carrier control.

The 2100 series room heating unit is factory configured for use with power

line carrier control. Refer to the Configuration Menu (Page 2.10) for

information on configuring the heater for the application.

PoWer line cArrier (Plc) PeAK control

The optional Steffes Power Line Carrier (PLC) control system has the ability to communicate with the heater

through the existing electrical circuits in the structure. With the power line carrier option, hard wired low voltage

connections from the power company's peak signaling switch connect directly to the transmitting device. The

switch signals peak control times to the transmitter, the transmitter sends the signal to an unlimited number of 2100

series heaters, which receive this information and respond accordingly.

In addition to providing peak control signals, the transmitting device also provides outdoor temperature

information, room temperature set back, and anticipated peak utility control signals (if applicable).

As the PLC system is optional, it must be specified at the time of ordering. If utilizing a PLC system, refer to

the Owner's and Installer's manual accompanying the transmitting device for information on the installation and

operation of the power line carrier control system.

PlC Communication is very reliable in most applications but can be affected and hindered

by connection method used, electrical layout of the application, operation of other equipment

in the same electric system, dirty power, etc. Steffes Corporation does not guarantee effective

communication of the PlC system in all applications and is not responsible for any communication

issues outside normal operating malfunctions.

2100 Series

Installation 2.06

Never install any wiring

in the line voltage

compartment of the 2100

series heater unless it is

rated for line voltage.

IMPORTANT

120V receptable requirements

Figure 6

grounding Screw

grounding Means

grounding Pin

(Fig 6A)

3-Slot grounded

receptacle

grounded Outlet

Box (Fig 6C)

Adapter (Fig 6B)

2-Slot receptacle

Advertising