Important, Brick loading – Steffes 2106 Owner & Installers Manual User Manual

Page 16

Advertising
background image

Installation 2.09

2100 Series

Figure 10

Note: row 8 brick faces down

row 7

row 6

row 5

row 4

row 3

row 2

row 1

Brick loading

BrICK lOADIng

Step 1 Verify that the heater is not energized.
Step 2 Direct Wired room heating Units Only - Place the heater

against the wall support bracket and use the carriage bolts

provided to securely mount the heater to the wall.

Step 3 Place the shipping box in front of the heater before loading the

brick to catch brick debris, to protect the flooring, and for easy

clean-up upon completion of the installation.

Step 4 Remove the screws on the right side of the galvanized front panel

and rotate the panel to the left to remove.

Step 5 If installing a Model 2104, 2105, or 2106, remove and discard the

cardboard spacer(s) from the brick core.

Step 6 Begin brick loading with row one by installing the first brick face-

up and sliding to the far right side of the heater's storage cavity.

Be sure the grooved side of the brick is up and fits tight against

the right air channel and the back insulation panel. Continue

loading the bricks for Row 1 as shown in Figure 9. The insulation

on the left side may need to be compressed to install the last brick

on each row.

To compress the side, squeeze the inner panel towards the outer panel as shown in Figure 9

below.

Step 7 Continue the brick loading process one row at a time. All bricks in rows one through seven must be loaded

with the grooved side up. (See Figure 10.)

Step 8 Install the eighth (top) row of bricks with the grooved side of the bricks facing down. (See Figure 10.) A

3" x 11" metal brick installation tool is enclosed in the information package to assist with loading the top

row of brick. Lay the metal tool over the far right brick in row 7. Slide a brick over the metal piece and into

position. Pull the metal piece out. Continue this procedure until the entire top row of brick is installed.

Step 9 Once all bricks are loaded, replace the galvanized front panel.

Brick Placement

Figure 9

The heater MUST be securely

mounted to the wall or to its

security base prior to brick

loading.

To properly seal the brick

core, make sure all bricks are

installed correctly.

Install bricks carefully to

avoid damage to the bottom

and back insulation panels of

the storage cavity.

Maintain an even horizontal

line across the brick core

during brick installation so

air flow through the heater

is not obstructed.

IMPORTANT

4

3

2

1

Advertising