ChemoMetec NC-3000 User Manual

Page 19

Advertising
background image

1 Inspection, Unpacking and Installation of Equipment

991-3001 Rev. 1.3

June-2013

3

1 Inspection, Unpacking and Installation of

Equipment

Upon receiving the order from ChemoMetec A/S, the box or boxes should be

carefully inspected for any damage that may have occurred during shipping. Any

damage must be reported to the carrier and to ChemoMetec A/S immediately.

Unpack the order, saving the packing materials for possible later use.

Verify that the ChemoMetec packing list received ref ers to the correct and ordered

materials, and that nothing is missing.

If any part of the order was damaged during shipping or is missing, or fails to

operate, please contact ChemoMetec A/S.

The document supplied with the instrument

2

:

IQ - Installation Qualification of the NucleoCounter

®

NC-3000

Describes in details how to inspect, unpack and install the NucleoCounter

®

NC-

3000™ instrument and the NucleoView NC-3000™ software. This IQ will also ensure

that the instruments basic functions correspond correct.

Operation of the NucleoCounter

®

NC-3000

™.

Before starting to use the NucleoCounter

®

NC-3000

™, it is important to refer to the

following document:

OQ - Operation Qualification of the NucleoCounter

®

NC-3000

This document presents a procedure, which upon successful completion will assure

that the advanced functions of the instrument are executed correctly.

Once the IQ and the OQ are finalized successfully, actual operation with the

NucleoCounter

®

NC-

3000™ can begin.

2

This document is present on the USB Flash drive supplied with the instrument

Advertising