10 installation instructions – Perfect Aire 1PAMSH36-MZO4-16 Installation Manual User Manual

Page 11

Advertising
background image

10

INSTALLATION INSTRUCTIONS

The length could be calculated from Fig.17:

Length = 8.3 inches + L (in general, L is half of the whole

length of the installation hook)

c. Please adjust the hexangular nuts on the four

installation hooks evenly, to ensure the balance

of the body.

Properly level the unit to check

the level of the main body from the four sides or

diagonal line direction, the level indicator also

can check the level from four sides of the main

body. Refer to Fig.18)

If the drainpipe is not level, leakage will be caused

by the malfunction of the water-level switch.

Adjust the position to ensure the gaps between

the body and the four sides of ceiling are even.

The body's lower part should recess into the ceiling

for 3/8 inches (10~12mm) (Refer to Fig.17).

(

2. Install The Panel

(1) Remove the inlet grid.

CAUTIONS

a. Slide two grid switches toward the middle

at the same time, and then pull them up.

(Refer to Fig.21)

o

b. Draw the grid up to an angle of about 30 ,

and remove it. (Refer to Fig.22)

New built houses and ceilings

a. In the case of new built house, the hook can be

embedded in advance (refer to the A.b mentioned

above). But it should be strong enough to bear the

indoor unit and will not become loose because of

concrete shrinking.
b. Refer to the A.c mentioned above for installation.

c. Remove the installation template.

Fig. 16

Ceiling

Panel

Hook

A

11

.2

in.

Nut

Body

23in.

L

0.

4~

0.

46

in.

6.

9in

.

34

Fig. 17

Ceiling

Body

H(

ce

ilin

g

he

igh

t)

Fig.18

Fig.19

Colourless

trans parent pipe

Horizontal

indicator

Fig.20

Body

Fixing hole

Installation

paper board

Screw M5 16

(Accessory)

Installation

paper board

Hook hole

Central hole

Grid switch

Fig.21

o

45

Fig.22

Advertising