22 air purging – Perfect Aire 1PAMSH36-MZO4-16 Installation Manual User Manual

Page 23

Advertising
background image

22

AIR PURGING

When Using the Vacuum Pump

(For method of using a manifold valve, refer
to its operation manual.)
1. Completely tighten the flare nuts, A, B, C, D,
connect the manifold valve charge hose to a
charge port of the low-pressure valve on the
gas pipe side.
2. Connect the charge hose connection to the
vacuum pump.
3. Fully open the handle Lo of the manifold valve.
4. Operate the vacuum pump to evacuate. After
starting evacuation, slightly loosen the flare nut
of the Lo valve on the gas pipe side and
check that the air is entering (operation noise
of the vacuum pump changes and a
compound meter indicates 0 instead of minus).
5. After the evacuation is complete, fully close
the handle Lo of the manifold valve and stop
the operation of the vacuum pump. Make
evacuation for 15 minutes or more and check
that the compound meter indicates

5

-76cmHg (-1x10 Pa).
6. Turn the stem of the packed valve B about

o

45 counterclockwise for 6~7 seconds after
the gas coming out, then tighten the flare nut
again. Make sure the pressure display in the
pressure indicator is a little higher than the
atmosphere pressure.
7. Remove the charge hose from the Low
pressure charge hose.
8. Fully open the packed valve stems B and A.
9. Securely tighten the cap of the packed valve.

Manifold valve

Compound meter

-76cmHg

Handle Lo

Handle Hi

Charge hose

Charge hose

Vacuum pump

Pressure gauge

Low pressure valve

Fig.67

Perform the electric safe check after
completing installation:
1. Insulated resistance
The insulated resistance must be more than 2M .
2. Grounding work
After finishing grounding work, measure the
grounding resistance by visual detection and
grounding resistance tester. Make sure the
grounding resistance is less than 4 .
3. Electrical leakage check (performing during
test running)
During test operation after finishing installation,
the serviceman can use the electroprobe and
multimeter to perform the electrical leakage
check. Turn off the unit immediately if leakage
happens. Check and find the solution
until the unit operates properly.

Electrical safety check

Safety and leakage check

Indoor unit

check point

Outdoor unit

check point

n m k

j i h

A

B

C

a

c

b

d

e

f

Fig.68

Advertising