13 installation instructions – Perfect Aire 1PAMSH36-MZO4-16 Installation Manual User Manual

Page 14

Advertising
background image

13

INSTALLATION INSTRUCTIONS

The horizontal pipe layout should avoid converse flow or bad flow:

Drainage pipe

Water flow

Drainage pipe

Drainage pipe

Drain tee

Drain tee

Water flow

Water flow

Water flow

Water flow

Water flow

Water flow

Water flow

Water flow

Drain tee

Water flow

Water flow

Keep a certain degree

Branch pipe

Branch pipe

Gas

Gas

Main pipe

Main pipe

Fig.30

For horizontal drainage pipe (The following table is for reference)

Attention: Use DWV/PVC40 or bigger pipe to be the main pipe according to code.

Advertising