VACUUBRAND MZ 2C NT VARIO without controller (o.C.) User Manual

Page 60

Advertising
background image

page 60 of 76

Put head cover cowling on.

Slide the head cover cowling in the grooves

of the caps (I) and under the connection

fasteners (Q).

Install the washers. Use a Torx driver T20 to

attach the 4 screws holding the head cover

cowling.

Tighten the fillister head screws (L) of the

connection fasteners (Q) with a Torx driver

T20.

Close the hinged covers.

Replace diaphragms and valves of the opposite side of

the pump in the same way.

Feed the PTFE hose into the inlet of the

exhaust vapor condenser. Mount the con-

denser with the counter holder (Torx screws

T10) to the pump. Fasten union nut.

PC 3002/3003/3004 VARIO:

Check the overpressure safety relief device

at the exhaust waste vapor condenser.

If necessary, pull off the old pressure relief

valve and install the new one. Check for

correct position of the PTFE-foil under the

pressure relief valve.

Advertising