Echelon i.LON 600 LonWorks/IP Server User Manual

Page 20

Advertising
background image

Section 1: Setting Up and Using the i.LON 600 L

ON

W

ORKS

/IP Server

The high voltage connection is implemented on screw terminals 1 (Earth Ground), 3
(Neutral), and 4 (Line): screw terminal 2 (NC) is not used and should remain
unconnected. A solid earth ground via terminal 1 connection is required for proper ESD
and EMC performance of the i.LON 600 device. Install the power mains in the following
order:

1. Insert the earth ground

2. Insert the neutral connection

3. Insert the line connection

DO NOT apply power to the i.LON 600 until you have checked all wiring
connections, and you are instructed to apply power
.

GND

Neutral

Line

NC

Figure 6.

High Voltage Mains Screw Terminals

Table 3. i.LON 600 Server AC Power Mains Connections

Screw Terminal

Enclosure Marking

Mains Connection

1 E

Earth

ground

2 NC

No

connect

3 N

Neutral

4 L

Line

!

SAFETY AND HIGH VOLTAGE WARNING

Ensure that the AC power mains are turned OFF before removing the cover, handling the
mains wiring, or connecting any mains cabling to the i.LON 600 device.

DO NOT under any circumstances operate the i.LON 600 device to mains voltages
outside of the range 115/230VAC, -14% to +8%, 50/60Hz

±2.5Hz.

12

Mounting, Cabling and Connections

Advertising