Heath Consultants Detecto-Pak 4 (DP) User Manual

Page 28

Advertising
background image

O

peration

100786-0 Rev. D

05/09

21

13. To check pulsating signal alarm operation by press zero up switch

until pulsating alarm sounds. Allow time for the meter to settle. The

pulsating alarm should turn on at a meter reading between 35-45%

of full scale. Return meter reading to zero.

14. To verify that the instrument is operational, the Detecto-Pak 4’s

sensitivity should be tested by introducing a small sample of a

known hydrocarbon gas to the sample inlet. The meter should swing

upscale and return to zero.

15. The Detecto-Pak 4 is now operational.

C. ZERO PROCEDURES

Zero the instrument as needed by the following procedure.

Before zeroing the Detecto-Pak 4, two conditions must be met:

1.

The instrument must be fully charged, and

2.

Either zero air from a demand regulator or a verified hydrocarbon

free atmosphere must be used. Zero air is recommended. The Average

background level of methane in the atmosphere is 2 ppm.

Zeroing Procedure:

a.

With the instrument’s power off, mechanically zero the meter using

a small blade screwdriver.

b. Start and warm-up the instrument as described under “OPERATING

PROCEDURES’, Chapter Five, Section V, B.

c.

Coarse zero the instrument on the 10 K ppm range. A micro

screwdriver will be needed to adjust the potentiometer (RP8)

located behind the right-hand (inner most) access plug on the rear

of the instrument below the fuel bottle holder. Remove the plug to

access the adjusting potentiometer. Refer to Figures 7 and 8 in the

manual.

**NOTE**

The fine zero control is automatically centered upon power-up. Do not

adjust the fine zero (by using the zero controls on the top panel) at this time.

d. Select the 50 ppm range and re-adjust the coarse zero.

e.

Re-insert the plug into the right hand access port.