Martin Christ RVC 2-25 CDplus User Manual

Page 36

Advertising
background image

RVC 2-25 CD&

6 Operation

36

Version 11/2008, Rev. 2.2 of 04/12/2013 • sb

Translation of the original operating manual

Pos: 131 /20 0 Ch rist/3 70 RVC-BA (S TANDARDMODULE) /06 0 Betri eb/0 60- 004 0-0 030 -00 30 B eche r @ 8 \mo d_1 309 500 943 610 _68. docx @ 46 836 @ 4 @ 1

6.4.3.3 Buckets

• Load each bucket symmetrically to its pivotal point to ensure swinging

to 90° under rotation.

correct

incorrect

at a standstill

under rotation

Fig. 16: Symmetrical loading of the buckets


• The balance point of the loaded bucket must be located considerably

below the pivotal point. If the balance point is too near the pivotal point,
the loaded bucket can be levered out of the bearings.

correct

incorrect

at a standstill
1

Pivotal point

2

Balance point



under rotation

Fig. 17: Loading of buckets considering the balance point

Pos: 132 /01 0 Univ ersal mod ule/ Ab schnitt swechs el @ 0 \mo d_1 202 124 514 062_ 0.d ocx @ 418 @ @ 1

Pos: 133 /01 0 Univ ersal mod ule/ Sei tenwe chsel @ 0\ mod _12 021 1624 431 2_0 .docx @ 1 05 @ @ 1

Advertising