Fill cycle, Figure 3-3, Bucket fill flow diagram – Parr Instrument 6400 User Manual
Page 25: Operation
Advertising
Operation
6400
3
w w w . p a r r i n s t . c o m
23
Fill Cycle
Once the calorimeter is started and the cover is closed, the fill sequence begins.
Figure 3-3
Bucket Fill Flow Diagram
1. The calorimeter checks the bomb ignition circuitry for continuity.
2. The water fill solenoid opens and water is pumped from the internal tank into and through the bucket that
surrounds the bomb. Overflow from the bucket is returned to the closed water tank. Because the jacket and
bucket are both filled with water from the closed water tank, initial equilibrium will be reached quickly.
3. The oxygen fill solenoid is opened and oxygen is added slowly to the bomb to bring its pressure to
approximately 30 atm.
Advertising