Cool/rinse, Figure 3-5, Rinse & cool flow diagram – Parr Instrument 6400 User Manual

Page 28: Operation

Advertising
background image

3

Operation

P a r r I n s t r u m e n t C o m p a n y

26

Cool/Rinse

At the completion of the post-period, the rinse and cool sequence begins.

Figure 3-5

Rinse & Cool Flow Diagram

1. Chilled water is circu-

lated through the bucket
to cool the bomb to the
starting temperature.

2. The release valve in the

bottom of the bomb is
opened and the residual
pressure is released
through the bomb ex-
haust line.

3. Once the excess oxygen

is vented, the bomb rinse
water from the rinse
water tank is admitted
through the bomb rinse
solenoid valve and the
check valve at the top
of the bomb. The bomb
rinse water is released to
the wash bottle.

Note:

Several rinse

patterns may be con-

figured by the user to

meet various opera-

tional and analytical

requirements.

4. The bomb is filled one

more time with oxygen
to help flush
the water
residue
from the
interior of
the bomb.

Advertising