• High voltage is correct and matches nameplate.

• Fuses, breakers and wire size correct.

• Low voltage wiring complete.

• Piping completed and water system cleaned and flushed.

• Air is purged from closed loop system.

• Isolation valves are open, water control valves or loop pumps wired.

• Condensate line open and correctly pitched.

• Transformer switched to 208V if applicable.

• Dip switches are set correctly.

• Blower rotates freely – foam shipping support has been removed.

• Blower speed correct.

• Air filter/cleaner is clean and in position.

• Service/access panels are in place.

• Return air temperature is between 50-80°F heating and 60-95°F cooling.

• Check air coil cleanliness to insure optimum performance. Clean as needed according to maintenance guidelines. To

obtain maximum performance the air coil should be cleaned before startup. A 10-percent solution of dishwasher

detergent and water is recommended for both sides of coil, a thorough water rinse should follow.

Startup Steps

NOTE: Complete the Equipment Start-Up/Commissioning Check Sheet during this procedure. Refer to thermostat

operating instructions and complete the startup procedure.

1. Initiate a control signal to energize the blower motor. Check blower operation.

2. Initiate a control signal to place the unit in the cooling mode. Cooling setpoint must be set below room temperature.

3. Cooling will energize after a time delay. Check for correct rotation of scroll compressors in 3 phase applications.

Incorrect rotation will cause low refrigerant pressures and possibly unusual noise. Switch any two power leads at the

line voltage supply.

4. Be sure that the compressor and water control valve or loop pump(s) are activated.

5. Verify that the water flow rate is correct by measuring the pressure drop through the heat exchanger using the P/T

plugs and comparing to the pressure drop table.

6. Check the temperature of both the supply and discharge water (Refer to Operating Parameters tables).

7. Check for an air temperature drop of 15°F to 25°F across the air coil, depending on the blower speed and entering

water

temperature.

8. Decrease the cooling set point several degrees and verify high-speed blower operation (variable speed ECM only).

9. Adjust the cooling setpoint above the room temperature and verify that the compressor and water valve or loop

pumps

deactivate.

10. Initiate a control signal to place the unit in the heating mode. Heating set point must be set above room temperature.

11. Heating will energize after a time delay.

12. Check the temperature of both the supply and discharge water (Refer to Unit Operating Parameters tables).

13. Check for an air temperature rise of 20°F to 35°F across the air coil, depending on the blower speed and entering

water

temperature.

14. If auxiliary electric heaters are installed, increase the heating setpoint until the electric heat banks are sequenced on.

All stages of the auxiliary heater should be sequenced on when the thermostat is in the Emergency Heat mode.

Check amperage of each element.

15. Adjust the heating setpoint below room temperature and verify that the compressor and water valve or loop

pumps

deactivate.

16. During all testing, check for excessive vibration, noise or water leaks. Correct or repair as required.

17. Set system to desired normal operating mode and set temperature to maintain desired comfort level.

18. Instruct the owner/operator in the proper operation of the thermostat and system maintenance.

NOTE: Be certain to fill out and forward all warranty registration papers.

Unit Startup

Before Powering Unit, Check The Following:

NOTE: Remove and discard the compressor shipping bolts. The bolts can then be discarded.

Advertising