Scheduling

For the purposes of scheduling, the C2H Compiler treats a loop and its
dependencies as a unit. No lines of code past the loop block execute until
the whole loop completes.

Figure 3–19

shows the dependency graph for

the function

transform_and_hash_matrix()

, shown in

Example 3–33

.

Example 3–33. Dependency Graph for a Function Containing a Loop

int transform_and_hash_matrix(int *matrix,
int length, int width)
{
int n_words = length * width;
int hash = 1;
int i;
for (i=0; i<n_words; i++)
{
...perform some transform...
hash = ...some hash calculation...
}
return hash;
}

Figure 3–19. Dependency Graph for a Function Containing a Loop

As shown in

Figure 3–19

, some part of the

for

loop depends on

n_words

, and so the C2H Compiler does not schedule the loop until after

the assignment to

n_words

completes. The

return

statement outside

the loop depends on

hash

, which is assigned inside the loop. As a result,

the C2H Compiler does not schedule the

return

statement until the loop

completes.

In this case, the state machine for

transform_and_hash_matrix()

has three states. However, the state machine does not complete in three
clock cycles, because State 1 consists of a sub-state-machine, which
requires multiple clock cycles to complete.