Tempest Thunder User Manual

Page 9

Advertising
background image

Thunder Enclosure User Manual

page

9

Mounting Base-down and Base-up

All Thunder enclosures are designed to be mounted base-down, on a solid structure, using Unistrut

mounting hardware. They may also be suspended from an overhang, ceiling or truss, using the

same hardware.

It is the responsibility of the installer to ensure that all mounting points are secure and conform to

local safety regulations. Tempest Lighting Inc. accepts no responsibility for damage or injury

arising from inappropriate or unsafe installation.

Drainage

Drainage holes are provided in the top and bottom of the enclosure. The holes in the cover (top) are

plugged with 10-32 screws and sealing washers.

Important – Drainage in base-up installations:

1

Remove the drainage plug screws from the cover

2

Replace in the corresponding holes in the base

Thunder
mounted Base-
down – note the
orientation of
the inlet and
outlet vents

Inlet
Vent

Outlet
Vent

Inlet
Vent

Outlet
Vent

Thunder mounted Base-up
– in this case the inlet and
outlet vents are flipped
vertically, to prevent
rainwater ingress

36”/914mm

Enclosure shown
is a Blizzard
projector
enclosure

Advertising
This manual is related to the following products: