2 mounting the hurricane enclosure, 3 important: orientation – Tempest Hurricane User Manual

Page 6

Advertising
background image

Hurricane Enclosure User Manual

page 6

2.2 Mounting the Hurricane Enclosure

The Hurricane enclosure may be mounted horizontally or vertically, on a solid structure, truss

or equivalent, rated for the weight of the enclosure and any equipment housed inside it.

Snow – if installed outside in cold regions, the lowest part of the Hurricane enclosure must be

at least 2’ (60cm) above maximum height of any snowfall or drifting snow, subject to local

conditions. If snow is not a consideration, then the enclosure must be installed at least

12”/30cm above ground level and maintained clear of drifting leaves and other potential

blockages to good drainage.

Enclosure will need to be powered at all times, although projector may not be.

LEAVE ADEQUATE CLEARANCE AROUND ENCLOSURE TO OPEN TOP COVER FOR SERVICE

Tempest Lighting recommends the use of stainless steel mounting hardware.

The Hurricane enclosure is provided with a pair of Unistrut channels under the enclosure base, for

mounting to your structure. You may use standard Unistrut accessories, or purchase either of the

mounting kits available from Tempest Lighting – four kits are required per enclosure.

4900.MB Stainless Steel Unistrut channel nut, bolt and
washer. Four required per enclosure.

4900.MC Stainless Steel Unistrut channel nut, bolt and
pipe clamp, for pipes 1.5” (38mm) to 2” (50mm) OD.

Four required per enclosure.

4925.MC Stainless Steel Unistrut channel
nut, bolt and pipe clamp, for pipes 2”
(50mm) to 2.5” (64mm) OD. Four required
per enclosure.

2.3 IMPORTANT: Orientation

Hurricane Enclosures may be mounted in the any orientation, subject to any limitations

stipulated by the manufacturer of the projector housed inside it. You are advised to check

the projector manufacturer’s installation manually carefully before planning your

installation.

Advertising