BE1-50/51B-235/-236 Testing

9252000898 Rev A

Figure 5-4. 51 Pickup, Time Dial, Integrating Reset, and 50-A Pickup Test Setup

1. Connect and configure the relay for 50-B pickup testing:

Instantaneous Overcurrent B (50-B) Pickup

a. Connect the test setup shown in Figure 5-5.
b. Set circuit board switch SW3 as follows:

SW3-1 = ON for 50 Hz operation or OFF for 60 Hz operation

SW3-2 = OFF (no additional time delay for the 50-A element)

SW3-3 = ON (Westinghouse CO type characteristic curves)

SW3-4 = ON (integrating reset characteristic)

c. Set TIME DIAL to 0.0.
d. Set CURVE to S.
e. Set TIME PICKUP to 3.18.
f. Set INST PICKUP (50-A) to 18.0.
g. Set INST PICKUP (50-B) (accessed at the top side of the assembly) to 20 (0.4 Aac).

2. Apply and slowly increase current to terminals 8 and 9 until the 50-B output contacts close. The

applied current should be between 0.387 and 0.413 Aac.

3. Decrease the applied current until the 50-B output contacts open.
4. Set INST PICKUP (50-B) to 80 (1.6 Aac).
5. Slowly increase the current applied to terminals 8 and 9 until the 50-B output contacts close. The

applied current should be between 1.563 and 1.637 Aac.

6. Reduce the applied current to zero.