DFI SB630-CRM User Manual

Page 25

Advertising
background image

25

2

Hardware Installation

8. Close the load plate then

push the load lever down.

While closing the load
plate, make sure the front
edge of the load plate
slides under the retention
knob.

Retention

knob

9. Hook the load lever under

the retention tab.

Load lever

Retention tab

Advertising
This manual is related to the following products: