Installation, Vent terminations – Montigo M40DV CL CR User Manual

Page 6

Advertising
background image

P/N XG0206

Page 6

M40DV-CR/CL Corner Gas Fireplace

Installation

Installing Heat Guards over Terminations

1. Ensure that the two

long mounting brackets are facing the bot-

tom of the termination. (See inset). This will provide more heat
protection at the top of the termination, where temperatures are
highest.

2. Attach to the faceplate of the termination using four sheet metal

screws.

Installing Terminations with MSR Frames

1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.

12

12

MSR

Figure 4b. Installing a PT0-3 termination with the MSR frame.

Figure 4c. Installing a PT0-3 termination with the MOSR frame.

12

12

12

MOSR

Installing Terminations with MOSR Frames

1. Frame the termination opening to 12" x 12".
2. Fasten the MSR frame to the interior side of the studs using a

minimum of 4 screws.

3. Insert the termination into the MSR frame as shown here, and

attach by screwing through the four pilot holes in the termination.

PTKOG

Figure 4d. Installing the heat guard.

PTO-3

PTO-3

Installing Terminations with Built-In Frames

Vent Terminations

1. Frame the termination opening to 11" x 11".
2. Fasten the termination to the studs using a minimum of 4

PTO-3F

11

11

Figure 4a. Installing a PT0-3F termination.

Advertising
This manual is related to the following products: